Control Room Panels Installation, Termination & Testing
Control room cabinet installation work is carried out under specialized engineers and supervisors for such jobs. Familiarized manpower utilized for installation, cable laying and termination of cables. Modern communication equipment is used for testing and continuity check:
Calibration Of Instrument
Fully equipped portable calibration shop is available to execute calibration work at site. Portable filled calibrators are used during field calibration.:
Fabrication and Installation
- Preparation of detail / shop drawing.
- Fabrication of stanchion at site according to site requirement
- Installation of instrument including impulse tubing,
- Cable tray / conduit and cable work.
Loop Checking And Functional Test
- Preparation of Loop folders
- Loop checking and identifying tags which are completed.
- Updating the information to others
- Functional Test.